机械设备外贸销售话术 SOP

设备是高单值、长决策、重售后的生意。客户买的不只是机器,还有安装、培训、备件和长期响应。这套话术把售后能力前置到销售阶段来讲,因为在设备行业,售后承诺本身就是最强的成交理由。

14 个场景 6 个环节 中文思路 + 英文话术 + 中文翻译 更新于 2026-08-27

按销售环节查看

本页场景目录

  1. 1欧美终端工厂采购经理(如美国食品加工厂问包装机)
  2. 2南美 / 东南亚 系统集成商
  3. 3非洲 / 中东 政府采购或 EPC
  4. 4客户问 "quote for a laser cutter"
  5. 5整线设计(灌装线 / 生产线)
  6. 6客户问 CE 证书
  7. 7正式报价(大型设备,含 TCO / ROI)
  8. 8客户要求 30% + 70% 见提单副本(我们要求发货前 100%)
  9. 9邀请客户到厂做 FAT
  10. 10超大件(OOG)出货沟通
  11. 11告知客户安装工程师出发信息
  12. 12老客户申诉"用了 2 年主轴异响"(保修期外)
  13. 13老客户产能瓶颈,主动提议加机
  14. 14客户不愿飞中国,视频看厂
开发信 & 首次触达 3 个场景

欧美终端工厂采购经理(如美国食品加工厂问包装机)

💡 中文思路
终端工厂采购最痛的三件事——**中国厂调试上不了门(签证/时区/技术水平)、备件断供、CE 证书造假被 EU 海关退回**。开发信要精准打这三点,不要吹产能。
🇺🇸 英文话术
Subject: Packaging line supplier with US-based service tech + 15-yr spare parts guarantee Hi {First Name}, Been reading about {Company}'s expansion into the {product line, e.g. ready-meal segment} — congratulations on the new Ohio facility. One thing I've heard repeatedly from US plant managers evaluating Chinese machinery: it's not the price they worry about, it's the **service reality after the container arrives**. Three specific pains: 1. **Commissioning delay**: manufacturer's engineer can't get a US visa within 90 days → line sits idle costing $8–15K/day 2. **Spare parts drought**: 8-month lead time on a $200 sensor because supplier discontinued production 3 years in 3. **CE marking without actual EU NB testing** — technically fine in US but you lose the ability to resell/relocate the line to a Mexico plant later How we're built for US buyers specifically: - **US-based service engineer network** (3 techs based in TX/OH/CA), 24-hr onsite response - **15-yr spare parts guarantee** in writing on the contract (not marketing copy) - **Digital twin remote diagnosis** — most issues solved on Zoom within 2 hours; onsite only when needed - **CE + UL + NFPA 79** actually tested by SGS + UL, not paperwork-only - **US warehouse** (Chicago) stocking critical spares — 2-day delivery, no export bureaucracy If you're evaluating suppliers for the Ohio project, or replacing an existing line elsewhere, would a 30-min video walkthrough of a running installation (Wisconsin food processor, similar layout to yours) be useful? Best regards, {Your Name} | Regional Sales Manager - Americas | WhatsApp: {xxx}
🇨🇳 中文翻译
主题:包装线供应商——美国本土服务工程师 + 15 年备件保证 {名字} 您好, 关注到 {公司} 进入 {产品线,如即食餐饮} 板块——新俄亥俄工厂恭喜。 反复从美国工厂经理听到评估中国机械时的痛点:不是价格担心,是**集装箱到厂后的服务真相**。三个具体: 1. **调试延误**:厂家工程师 90 天办不下美国签证 → 生产线停摆日损 $8–15K 2. **备件断供**:$200 传感器 8 个月等货,因供应商 3 年前就停产 3. **CE 无欧盟公告机构真测**——美国无所谓,但未来把线转售/搬到墨西哥厂就废 我方针对美国买家专门配置: - **美国本土服务工程师网络**(TX/OH/CA 3 人),24 小时上门 - **合同白纸黑字 15 年备件保证**(不是营销话术) - **数字孪生远程诊断**——多数问题 2 小时 Zoom 解决,必要才上门 - **CE + UL + NFPA 79** SGS + UL 真测,不是纸面 - **美国仓(芝加哥)** 关键备件常备,2 天到货,无出口手续 如在评估俄亥俄项目供应商或替换现有线,需要 30 分钟视频看运行中安装吗(威斯康辛食品厂,布局与您类似)?

南美 / 东南亚 系统集成商

💡 中文思路
集成商 = 项目型销售,关心**利润空间 + 品牌保护 + 技术支持能力**。开发信要谈"如何帮您赢标+保利润",不要卖单机。
🇺🇸 英文话术
Subject: Injection molding machinery — integrator support, MAP pricing, project-based Hi {Name}, {Company} looks like the most established injection molding integrator in {country} — 12+ years in market, deep relationships with the automotive Tier-2 base. A quick question before pitching: how many bids have you lost in the last 12 months because your machine partner undercut you on the same brand somewhere else in your market? For most integrators I talk to, it's 2–4 deals a year — usually $500K+ each. How we protect integrator margin: - **MAP pricing enforced** across all channels in {country} — I can put in writing - **Project registration** system — you register a prospect, we can't sell to them for 90 days minimum - **Deal support**: I fly (or Zoom) with you to end-customer meetings — you own the relationship, I'm the "factory technical" role - **Commission structure**: 8–18% based on project size (transparent, tiered) - **Warranty passed through your entity** — you're the warranty owner, we back you up, end-customer never contacts us directly (unless you invite) - **Free training** for your 2 senior engineers annually at our plant (visa support included) Machines specifically: - 60T–3,300T IMM range, servo standard, all-electric line for high-precision - Repeatability ±0.15%, energy 35% below hydraulic benchmark - CE, UL, EAC, INMETRO available on request Would you be open to a 30-min introductory call? I'll share our current integrator program terms + 2 reference projects your team can call for validation. Saludos, {Your Name}
🇨🇳 中文翻译
主题:注塑机——集成商支持、MAP 定价、项目型 {名字} 您好, {公司} 看起来是 {国家} 最成熟的注塑集成商——市场 12+ 年,与汽车 Tier-2 基础关系深厚。 推销前问一个问题:过去 12 个月您因机器伙伴在您市场其他项目上砸价,输了几个标?大多集成商反馈是 2–4 个/年,通常每个 $50 万以上。 我方如何保护集成商利润: - **MAP 定价强制**在 {国家} 所有渠道——白纸黑字 - **项目注册**系统——您注册线索后 90 天内我方不能对该客户销售 - **交易支持**:我陪您(视频或飞过去)见终端客户——关系归您,我扮"厂家技术" - **佣金结构**:按项目额 8–18% 分层,透明 - **保修走您公司**——保修责任在您,我方兜底,终端客户不直接联系我方(除非您邀) - **免费培训**您 2 位资深工程师每年到厂(含签证支持) 机器具体: - 60T–3300T 注塑机全谱,标配伺服,高精度全电动线 - 重复精度 ±0.15%,能耗低于液压基准 35% - CE / UL / EAC / INMETRO 按需 方便约 30 分钟视频初聊吗?可发我方集成商政策+2 个参考项目供您团队直接验证。

非洲 / 中东 政府采购或 EPC

💡 中文思路
政府/EPC 项目关心的是**招投标合规、融资匹配、Turnkey 交钥匙能力**。开发信要提"能不能进您的 approved vendor list",用融资和 Turnkey 破冰。
🇺🇸 英文话术
Subject: {Product line} for {country} — Approved Vendor List application with financing package Dear {Name}, {Your Name} from {Company}. Reason for direct outreach: I understand {Ministry / EPC Company} is preparing the {Program name — e.g. 2027 water treatment expansion} program, and I'd like to submit our credentials for consideration in your Approved Vendor List. **What we bring**: - Turnkey scope: design → equipment → shipping → installation → commissioning → training → 2-year onsite service - Reference projects in similar climate/regulatory context: {list 2, e.g. "Egypt New Cairo WWTP 45,000 m³/day 2023, Nigeria Lagos industrial park 2024"} - **Full financing package via Sinosure + China Exim Bank**: up to 85% project value at OECD CIRR-linked rates, tenor 5–10 years, buyer credit - Local partnership option: joint venture with your appointed local contractor for civil works and long-term service - Full compliance with {country-specific standards, e.g. SASO / SONCAP / KEBS} **Proposed next step**: Submission of our pre-qualification dossier (financial audit, ISO certs, technical brochures, reference letters) — please advise: 1. The correct entity/contact for submission 2. Any pre-qualification questionnaire template 3. Preferred language for submission (English / French / Arabic — all supported) Available for a formal presentation to your technical committee at your earliest convenience. Best regards, {Your Name} International Projects Director | {Company}
🇨🇳 中文翻译
主题:{产品线} 用于 {国家}——合格供应商名单申请含融资方案 {名字} 您好, 我是 {公司} 的 {名字},直接联系原因:了解到 {部委/EPC 公司} 正筹备 {项目名,如"2027 水处理扩建"},希望递交我方资质进入您方合格供应商名单。 **我方所带**: - 交钥匙范围:设计→设备→运输→安装→调试→培训→2 年上门服务 - 类似气候/监管环境参考项目:{列 2,如"埃及新开罗污水处理厂 45000 m³/日 2023、尼日利亚拉各斯工业园 2024"} - **中信保 + 中国进出口银行完整融资方案**:项目价值最高 85%,OECD CIRR 利率,期限 5–10 年,买方信贷 - 本地伙伴选项:与您指定本地承包商成立合资做土建与长期服务 - 完全符合 {国家标准,如 SASO / SONCAP / KEBS} **建议下一步**: 递交资格预审文件(财务审计、ISO 证书、技术手册、参考信)——请告知: 1. 递交对应实体/联系人 2. 预审问卷模板 3. 语言偏好(英/法/阿——均支持) 随时可到您技术委员会做正式演示。
询盘首次回复(工况诊断 = 报价前提) 1 个场景

客户问 "quote for a laser cutter"

💡 中文思路
机械设备最忌"直接报价"。同样"激光切割机"根据**材料/厚度/尺寸/产能/自动化程度**价格可以差 20 倍。**用一份专业工况问卷让客户觉得你是解决方案供应商,不是发货商**。
🇺🇸 英文话术
Hi {Name}, Thanks for the enquiry. Fiber laser cutter is a family of machines — the difference between a $28K and a $480K unit is entirely in how you cut what you cut. To send you a real recommendation: **Application & production** 1. **Materials** you'll cut: mild steel, stainless (grade?), aluminum, brass, copper, or mix? 2. **Thickness range**: from what to what? (For fiber, 0.5 mm–25 mm is one machine class; 25–50 mm is a different beast) 3. **Typical sheet size**: 1.5×3 m? 2×4 m? 2×6 m? (Determines table size) 4. **Production volume**: how many shifts, how many hours cutting/day? 5. **Precision requirement**: cosmetic parts, structural parts, precision fit parts? **Automation level** 6. Manual loading OK, or need automated sheet exchange table? 7. Any need for tube cutting attachment (rotary chuck)? 8. Integration with your MES / ERP? **Environment & power** 9. Country / voltage / frequency (415V 50Hz? 480V 60Hz?) 10. Cutting gas supply: nitrogen (better edge), oxygen (mild steel thick), air (economical)? **Compliance & service** 11. Certification required (CE, UL, KCS, EAC)? 12. Language for HMI + manual + service? **Commercial** 13. Target budget range (helps us not waste your time on wrong-sized options)? 14. Delivery target date? 15. Financing needed? Even a partial answer lets me propose 2 concrete machine configs with quote + ROI. I'll turn it in 3 working days. Best, {Your Name}
🇨🇳 中文翻译
{名字} 您好, 感谢询盘。光纤激光切割机是一整个机器家族——$28K 到 $480K 的差异完全在切什么、怎么切。为给您真实推荐: **应用与产能** 1. **切什么材料**:碳钢/不锈钢(哪种)/铝/黄铜/紫铜/混切? 2. **厚度范围**:从多厚到多厚?(0.5–25mm 是一档机型,25–50mm 完全不同) 3. **典型板幅**:1.5×3m?2×4m?2×6m?(决定工作台) 4. **产量**:几班?每天切几小时? 5. **精度要求**:外观件/结构件/精密配合件? **自动化** 6. 手动上下料可以还是需自动交换台? 7. 需要管材切割卡盘吗? 8. 是否集成您 MES/ERP? **环境电源** 9. 国家/电压/频率(415V 50Hz?480V 60Hz?) 10. 切割气:氮气(切边好)/氧气(厚碳钢)/压缩空气(经济)? **合规与服务** 11. 认证要求(CE/UL/KCS/EAC)? 12. HMI+手册+服务语言? **商务** 13. 目标预算范围(避免推错型号浪费您时间)? 14. 目标到货日? 15. 需要融资吗? 哪怕回答一半,3 工作日内我可给 2 个具体机型配置+报价+ROI 测算。
项目型询盘:方案设计与产能验证 1 个场景

整线设计(灌装线 / 生产线)

🇺🇸 英文话术
Dear {Name}, Turnkey line proposal for your carbonated beverage bottling — 500 ml PET, 12,000 BPH capacity: **Proposed line layout** (attached PDF layout, 32 × 6 m plant footprint): 1. **Blowing** — 8-cavity rotary PET blower, 12,800 BPH nominal, matches downstream 2. **Air conveyor** — 6 m, adjustable neck rails 3. **Rinser–filler–capper monoblock** — 24-12-6, isobaric, 12,000 BPH at 550 ml 4. **CO₂ mixer + carbo-cooler** upstream, 5.0 g/L capability 5. **Labeler** — OPP hot-melt roll-fed, 200 mm max height 6. **Coder** — inkjet on shoulder + cap 7. **Shrink wrapper + tray shrink** — 6-pack or 12-pack configurable 8. **Palletizer** — 4-axis robotic, 800 pack/hr 9. **Stretch wrapper** **Utility requirements** (please validate against your site): - Electrical: 380V/50Hz, 3-phase, installed load ~320 kW, running ~180 kW - Compressed air: 40 bar for blowing (dedicated), 6 bar general 3.5 m³/min - CO₂: food-grade, 25 kg/hr peak - Water: RO 8 m³/hr, chilled 4°C for glycol jacket - Steam: 250 kg/hr saturated for CIP **Performance guarantee**: - Efficiency (OEE): 85% at 12,000 BPH sustained after 30-day stabilization - Waste: PET < 0.4%, cap < 0.2%, CO₂ < 3% - Product quality: fill volume ±1.5 ml, torque ±0.2 Nm **Timeline**: - Contract → FAT (in China): 8 months - FAT → Shipping: 3 weeks - Installation onsite: 8 weeks - Commissioning + SAT: 4 weeks - Training + performance test: 4 weeks - **Total: ~13 months contract to production** **Investment**: FOB Shanghai turnkey line ~$1.85M, DDP + installation ~$2.35M (financing available) Suggest a 60-min video call with our line engineer to walk through the layout + Q&A. Also happy to arrange a factory visit — we have a similar line running for a Vietnamese customer that we can demonstrate live. Best regards, {Your Name}
🇨🇳 中文翻译
[整线方案,翻译略——重点是显示 Turnkey 能力和性能保证]
认证 & 合规 1 个场景

客户问 CE 证书

🇺🇸 英文话术
Dear {Name}, CE marking — this is where a lot of Chinese machinery slips into paperwork-only compliance, so let me be very specific about what we have vs. what most competitors claim: **What real CE-marked machinery requires**: - EU Machinery Directive 2006/42/EC (safety, mechanical, electrical) - EMC Directive 2014/30/EU (electromagnetic) - LVD 2014/35/EU (low voltage) - PED 2014/68/EU (if pressure equipment) - Applicable harmonized standards: EN ISO 12100 (risk assessment), EN 60204-1 (electrical), EN ISO 13849-1 (safety-related controls, PLd), etc. **Our compliance package** (per machine): | Element | Status | |---|---| | Full risk assessment per EN ISO 12100 | ✅ SGS assessed | | Electrical design to EN 60204-1 | ✅ Verified | | Safety category assessment (PLd) | ✅ ISO 13849 compliant | | EMC testing (EN 61000-6-2/6-4) | ✅ TÜV Rheinland test report | | LVD testing where applicable | ✅ | | Technical file (Annex VII) | ✅ 200+ pages, retained | | EU Declaration of Conformity (per unit) | ✅ Signed by authorized signatory | | Operator manual per Annex I 1.7.4 | ✅ Full EN language, plus your local language on request | | CE nameplate | ✅ Riveted on machine, per Annex III | **We do NOT do "self-declared CE without technical file"** — that's what gets machines seized at Rotterdam customs. **Notified Body involvement**: For any Annex IV machinery (list-based higher-risk), we go through Notified Body. Non-Annex IV, we self-declare with full technical file (per Directive). **Also available on request**: - UL 508A (US industrial control panels) - CSA (Canada) - EAC (Russia/Belarus/Kazakhstan) - INMETRO (Brazil) - SASO IECEE (Saudi Arabia) Want me to send the full CE technical file sample from a similar machine? It's ~150 MB but I can share via WeTransfer or on-site during your visit. Best regards, {Your Name}
🇨🇳 中文翻译
[认证清单,翻译略——重点是显示合规深度非表面]
报价(Quotation)与 Total Landed Cost 1 个场景

正式报价(大型设备,含 TCO / ROI)

🇺🇸 英文话术
Subject: Quote #M-2607 | 3kW fiber laser cutter turnkey | Full landed cost + ROI Dear {Name}, Full quote breakdown with total landed cost and payback analysis, so decision is based on lifecycle not sticker price. **Machine**: 3 kW fiber laser cutter, 3×1.5 m table, IPG source, Precitec cutting head, single sheet exchange **Investment breakdown**: | Line | USD | |---|---| | Machine (EXW Jiangsu) | $68,500 | | Standard tooling kit + nozzles (500 pcs) | $1,200 | | Chiller (5 kW) | $2,800 | | Spare parts kit (2-yr coverage) | $3,500 | | Sub-total EXW | **$76,000** | | Ocean freight (40HQ to LA) | $4,200 | | US import duty (HTS 8456.11, 3.9% MFN) | $2,964 | | Inland trucking LA→your plant (Nevada) | $1,850 | | **CIP your plant, US** | **$85,014** | | Installation + 3-day commissioning (2 techs) | $6,800 | | Operator training (3 days) | $2,400 | | **Total turnkey to production** | **$94,214** | **Operating cost per hour** (indicative, 2 shifts): | Item | Value | |---|---| | Electricity (18 kW × $0.11) | $1.98 | | Gas (N₂, 15 m³/hr × $0.35) | $5.25 | | Consumables (lens, nozzle, amortized) | $1.20 | | Maintenance (amortized annual $3,600) | $0.90 | | **Total run cost / hr** | **$9.33** | **ROI model** (based on typical US job-shop billing $180/hr for 10-14 GA mild steel): - Contribution margin per hr: $180 – $9.33 – $30 labor = **$140.67/hr** - Assumed utilization: 55% of 2-shift capacity = 2,000 productive hrs/yr - **Annual contribution: $281K** - **Payback: 4.0 months** on machine + 4.5 months full turnkey **Included**: - 2-yr comprehensive warranty (parts + labor, onsite) - Free software updates for 5 years - Remote diagnostic access (24/7) - 15-yr spare parts availability guarantee **Terms**: 30% T/T deposit, 70% before shipment. Sinosure available. **Lead time**: 60 days ex-factory, 90 days to your plant. If numbers work directionally, next step is FAT visit invitation (we cover your travel + 1 hotel night for 2 people from your side) once we have deposit. Best, {Your Name}
🇨🇳 中文翻译
[同结构,翻译略——重点是完整 ROI 拆解]
议价 / 大额付款条款 / 保函 1 个场景

客户要求 30% + 70% 见提单副本(我们要求发货前 100%)

🇺🇸 英文话术
Dear {Name}, On payment terms — I hear you, "70% against B/L copy" is a very common ask, especially on machinery >$100K. Let me walk through what we can and can't do, and why: **Why "70% before shipment" is our default**: Machinery is highly configured to you — it can't be resold to another customer if the deal collapses at shipment stage. Unlike commodities, our downside risk on a machine sitting on the dock is 40–60% of value. **What we can do to move toward your ask**: **Option 1 — LC 100% at sight** (recommended for you) - 100% Irrevocable LC at sight, confirmed by top-tier bank (HSBC, Citi, DB) - No T/T deposit — clean for your cash flow - Documents against payment: B/L, insurance, CO, CI/PL, FAT report - Price +0.8% to cover LC confirmation cost **Option 2 — 30% T/T + 70% LC 60 days** (hybrid) - 30% at PO (secures material + start of build) - 70% via LC 60 days from B/L, so you have 60 days after shipping to inspect + pay - Standard price **Option 3 — Sinosure-backed 30/70 on B/L copy** - 30% T/T deposit - 70% T/T against B/L copy, backed by Sinosure short-term insurance on your entity - Sinosure covers 90% of our risk - Requires 7–10 days for Sinosure approval on {your company} - We absorb the ~0.6% Sinosure fee **Option 4 — Trust building** - First order: 30/70 T/T (our standard) - After 2 clean orders: unlock Option 3 terms automatically - After 5 orders: LC 90 days available Which structure fits your treasury best? Option 1 is the fastest path if you can arrange the LC. Best regards, {Your Name}
🇨🇳 中文翻译
[同结构,翻译略]
打样与工厂验收(FAT / SAT) 1 个场景

邀请客户到厂做 FAT

🇺🇸 英文话术
Dear {Name}, Your machine (SN 260728-M01) is ready for FAT. Formal invitation attached, key points below: **FAT scope** (5 working days at our plant, Suzhou): **Day 1 — Machine walkthrough & static tests** - Physical inspection vs. approved layout drawing - Nameplate, safety devices, emergency stop check - Electrical panel inspection per EN 60204-1 - Grounding and continuity tests - Insulation resistance test (Hi-pot) **Day 2 — Function tests (no load)** - All axes homing and travel per spec - Speed and acceleration tests (each axis) - Machine health parameters vs. spec - HMI navigation, alarm simulation - Safety interlock tests (10+ scenarios) **Day 3 — Performance tests (with material)** - Your provided material (or ours if not shipped): cutting/machining per your typical parts - Cycle time verification - Dimensional accuracy on witness parts (3 samples, CMM report) - Repeatability run: 20 consecutive cycles, tolerance check - Cutting quality: edge roughness, kerf, HAZ (for laser) **Day 4 — Endurance + integration** - 8-hour continuous run at production speed - Data logging: uptime, temperature, alarms - Integration test with your automation (if applicable) - Simulated fault + recovery (5 scenarios) **Day 5 — Documentation + acceptance** - Review of full doc package (manuals, wiring diagrams, spare parts list, safety file) - Training plan review - Punch list negotiation (any observations) - FAT report sign-off — either "Accept", "Accept with Punch List" (list items to be closed before shipping), or "Reject" (rare) **What we cover** (your team of up to 3): - Hotel (business class near plant, 5 nights) - Airport pickup + all local transportation - Lunch + dinner at plant (or evening dinner in Suzhou) - Optional 1-day sightseeing after FAT (Suzhou classical gardens) **What you cover**: - International flights - Visa (invitation letter we provide, attached) Suggested dates: {date A} or {date B}. Please confirm attendee names + passport info + preferred date, and I'll book everything on our side. Best regards, {Your Name}
🇨🇳 中文翻译
[FAT 邀请函,翻译略]
生产 & 出货(大件海运 / OOG / 装柜) 1 个场景

超大件(OOG)出货沟通

🇺🇸 英文话术
Hi {Name}, Shipping planning for your machine (SN 260728-M01) — dimensions 8.2 × 3.1 × 3.3 m, 22 tons. This is out-of-gauge (OOG), so I want to walk you through options + implications so nothing surprises: **Option A — Flat Rack (FR)** *recommended* - 40' FR carries the machine natively - No dismantling required - Freight: ~$8,200 to Rotterdam (base) + $2,400 OOG surcharge - Transit: 32 days port-to-port - Sailings: bi-weekly (MSC, CMA) **Option B — Break-bulk / RoRo** - Loaded on mafi trailer, no container - Freight: ~$11,500 - Transit: 38 days - Sailings: monthly (Wallenius, Höegh) **Option C — Partial disassembly + 2× 40HQ containers** - We remove electrical cabinet, guarding, gantry - Fits in 2× 40HQ standard - Freight: $9,600 total - Transit: 32 days - **Downside**: adds 4 days re-assembly at your plant + risk of miscabling **My recommendation**: Option A (Flat Rack). Marginally more expensive than Option C but zero disassembly = zero commissioning risk. **Also needed for OOG shipping**: - Lashing plan by certified marine surveyor (we arrange, cost $850) - Manufacturer's certificate of origin (we provide) - Rigging plan for load/unload at your side (I can send the machine CoG diagram to your riggers) **Insurance** (please advise your preference): - We insure at 110% CIF (institute cargo clauses A) — most common - Or you buy your own coverage (I share commercial invoice + packing list) **Delivery site prep on your side** (please confirm ready by shipment date): - Concrete floor ≥ 200 mm thick, level ±3 mm/2 m - Overhead clearance ≥ 4.5 m from floor - Access door / roll-up ≥ 3.5 m wide - Nearest crane rated ≥ 30 tons within 20 m of installation point Confirm option preference and I'll book. FR bookings for {month} are tightening, ideally lock within 5 days. Best, {Your Name}
🇨🇳 中文翻译
[OOG 出货说明,翻译略]
上门安装、调试与培训 1 个场景

告知客户安装工程师出发信息

🇺🇸 英文话术
Hi {Name}, Commissioning team travel plan for {machine}, planned start date {date}: **Team dispatched** (2 engineers): - {Name 1}, Senior Commissioning Engineer, 12 years experience with our platform, 4 previous US commissionings — English fluent - {Name 2}, Electrical Engineer, PLC + HMI specialist **Travel**: - Flight: {airline} FL {##}, arriving {city} 8/12 15:40 local - Hotel: {hotel name} (booked by us, 5 min from your plant) - Return: 8/26 open — return only after your acceptance signoff - Visas + travel insurance — done **What we need from you before arrival** (please confirm each): - [ ] Machine unloaded and positioned at final location per foundation drawing - [ ] Utilities available at machine: 480V 3PH 60Hz, compressed air 100 psi, cutting gas per spec - [ ] Operator team (recommend 2–3 people) available for full duration - [ ] Test material ready: {material spec + quantity} - [ ] Local safety induction — our team will complete on Day 1 (typically 2 hrs) - [ ] Working hours: we're flexible, but 45 hrs/week baseline; overtime billable at $65/hr per engineer **Commissioning schedule** (14 working days): - Days 1–3: Machine setup, alignment, first power-on, subsystem checks - Days 4–7: Loaded run, cutting tests on your material, parameter optimization - Days 8–10: Integration with your MES / material handling - Days 11–12: Operator training (theory + hands-on) - Day 13: Maintenance training + spare parts walkthrough - Day 14: Performance test + SAT sign-off **Contact during commissioning**: - Onsite lead: {Name 1}, +86 XXX (Chinese SIM), plus we'll get US local SIM Day 1 - Backup / remote support: myself + factory tech team, 24/7 available Anything unclear or missing on your prep list? Best to catch it now before flights are irreversible. Best, {Your Name}
🇨🇳 中文翻译
[调试工程师派工函,翻译略]
售后(备件 / 维修 / 5 年保修) 1 个场景

老客户申诉"用了 2 年主轴异响"(保修期外)

🇺🇸 英文话术
Hi {Name}, Sorry to hear the spindle noise issue. Two years in, we're technically 6 months out of warranty, but I want to help — you've been a good customer and this shouldn't be a wall you hit alone. **First: diagnosis** (can we do it remotely?) Please send: 1. Video of noise during idle rotation (all speeds if possible: 100, 500, 1500, 3000 rpm) 2. Spindle temperature during noise event (thermal camera or IR gun reading) 3. Vibration reading if you have an analyzer (X, Y, Z at spindle housing) 4. Machine hours + last lubrication service date 80% of "spindle noise" complaints resolve to: - Bearing lubrication depleted (fixable onsite, $150 grease kit) - Pulley misalignment (adjustment, no parts) - Cutting harmonic (parameter change, no fix needed) Only ~20% are actual bearing failure requiring spindle rebuild. **Cost/support scenarios**: - **If issue is lubrication/adjustment** (remote guidance): free of charge, we'll walk your team via Zoom video - **If it's a wear item we should have flagged** (e.g., recommended service missed in our manual): we send parts free + labor guidance free - **If it's actual bearing failure and out of warranty**: our real cost — new bearing set ~$2,200, our tech onsite 2 days ~$3,600, or we ship parts + video-guide your team (~$2,600 total). I can also see if goodwill covers 30% given loyalty and service record. **What we won't do**: try to sell you a full new spindle assembly ($18K) when a bearing replacement solves it. Let's start with the data. Reply with the videos and I'll turn diagnosis in 24 hours. Best, {Your Name}
🇨🇳 中文翻译
[保外维修,翻译略]
复购 / 生产线扩产 / 代理 / 沉默激活 1 个场景

老客户产能瓶颈,主动提议加机

🇺🇸 英文话术
Hi {Name}, Casual data-share, not a pitch — I was pulling numbers on our joint installation and noticed: - Your machine's average utilization last quarter: 76% (up from 58% Q2) - Rejection rate: down to 0.4% (excellent) - Alarm hours (planned + unplanned): 3.2% (industry benchmark 6–8%) Two things this suggests: 1. **You're near capacity ceiling** — at 76%, adding another shift or reducing changeover time is possible but the marginal gain is limited. Second machine becomes the leverage point. 2. **Your team runs this machine really well** — a second machine deployment will be much faster than the first (2-week commissioning vs. our typical 4-week for first-timers). If a Machine 2 is anywhere on your roadmap, worth a chat now for two reasons: - **Repeat-customer pricing**: ~7% off list, plus we cover the second FAT visit - **Lead time**: production slots for {month} are still open; by Q4 slots push to 18 weeks Not selling — just data. If it's not on the roadmap, no worries and I appreciate the run rate you've kept the current one on. Best, {Your Name}
🇨🇳 中文翻译
[扩产激活,翻译略]
展会 / 视频看厂 1 个场景

客户不愿飞中国,视频看厂

🇺🇸 英文话术
Hi {Name}, Totally understand the reluctance to fly — most of our first-time buyers now start with a virtual tour, and if they like it, either do FAT in-person or fully remote-witness via video. Here's what a proper virtual tour looks like on our side (not "hold a phone and walk around"): **60-min guided video walkthrough** (Zoom or Teams): - Live drone + handheld footage from our workshop - Live machine of the model you're evaluating, in operation - Cutting demo on your material spec (if you send us a sample beforehand) - Q&A with our chief engineer - Views of our warehouse, incoming QC, sub-supplier lists, ERP screens **Documents shared before/after**: - ISO 9001 + specific process certs - 2 signed reference letters from customers in your region - Full test report of the machine we demoed - Bank reference letter, D&B report on request **Reference customer calls**: - I can introduce you to 2 US-based customers of ours on the same model — 20-min calls, they'll speak candidly (I don't listen in) Would this be useful as a next step? I can send a calendar invite with a proposed 60-min slot next week + a list of specific questions I'll cover unprompted. Best, {Your Name}
🇨🇳 中文翻译
[视频看厂邀请,翻译略]

常见问题

客户要求视频看机或来厂验厂怎么安排?

主动提供而不是被动接受。准备好设备运行视频、产能实测数据和同类客户案例,验厂前发送日程安排。本页信任建立板块有完整话术。

设备大额订单客户不愿付高比例定金怎么办?

可以按生产节点分期,或引入第三方担保和信用证方式。关键是把定金和采购原材料、排产锁定的实际成本挂钩来解释。

客户担心售后响应不及时怎么打消顾虑?

给出明确的响应时效承诺、备件常备清单和远程指导方式,并提供已合作客户的售后记录佐证。

其他行业话术

需要针对你的产品定制话术?欢迎交流