新能源产品外贸销售话术 SOP
新能源是项目型生意,决策链长、单值高、合规门槛硬。客户第一轮问的往往不是价格而是认证清单和项目案例。这套话术把合规问询、方案配置、分期付款这三块做成了标准应答,避免销售在技术细节上被问住。
按销售环节查看
本页场景目录
- 1欧洲户储 / 光伏系统集成商
- 2中东 / 南亚 EPC 承包商(工商业储能)
- 3Amazon / Costco 便携电源零售商
- 4客户问 "please send me your best price for 100 kWh BESS"
- 5客户给了负载数据,需你配光储方案
- 6客户问 "do you have UL 9540 / VDE / IEC 62619"
- 7户储 5 kWh × 200 台报价(多组件系统)
- 8MW 级项目,客户要 90 天账期
- 9首台样机寄出(附完整测试报告)
- 10主动周报 + 船期紧张场景
- 11现场故障,客户投诉 3 台户储无法启动
- 12客户合作 6 个月,主动提独家代理
- 13Intersolar / RE+ 展台 30 秒电梯自我介绍
- 1460 天无回复(结合行业新闻)
开发信 & 首次触达
3 个场景
欧洲户储 / 光伏系统集成商
💡 中文思路
欧洲系统集成商最痛的三件事——**认证不全被海关退回、保修承诺无 EU 实体接不了、渠道政策乱窜货**。开发信要精准打这三点,不要谈"5GW 产能"(欧洲人不 care 规模)。
🇺🇸 英文话术
Subject: DE-warehoused BESS with 12-year onsite warranty — supplier update
Hi {First Name},
Been reading up on {Company} — noticed you're focused on the 5–20 kWh residential BESS bracket, mostly through installer channels in {DACH / BeNeLux}.
A few pain points I hear repeatedly from EU integrators this quarter:
1. Product cleared customs but blocked by network operator (VDE-AR-N 4105 issue on inverter grid-code) → 3-month project delay
2. Manufacturer's "10-year warranty" turns out to be **factory-return warranty**, not onsite — installer eats the labor
3. Same product hitting the market at –12% from a grey channel, undercutting authorized partners
How we're set up specifically for EU integrators:
- **CE + IEC 62619 + VDE 2510-50 + BSW-approved** BESS, VDE-AR-N 4105 / EN 50549 grid code pre-certified
- **DE warehouse (Hamburg)** — 500 units always in stock, 3-day delivery to any DE address
- **12-year onsite warranty via our EU GmbH** — real German entity, real service partner network (SVOLT / Fraunhofer alumni team)
- **Channel protection** — MAP pricing enforced, geo-locked serial numbers, unauthorized sellers cut off within 30 days
Would a data sheet + reference project list from installers in your region be useful? Happy to send + suggest a 20-min video walkthrough if you like what you see.
Best,
{Your Name} | Sales Director EU | WhatsApp: {xxx}
🇨🇳 中文翻译
主题:德国仓储 BESS + 12 年上门保修——供应商备选
{名字} 您好,
研究过 {公司}——注意到您聚焦 5–20 kWh 户储市场,主要在 {DACH / 荷比卢} 通过安装商渠道。
本季度欧洲集成商反复听到的三个痛点:
1. 产品清关后被电网公司拒(逆变器 VDE-AR-N 4105 并网码问题)→ 项目延误 3 个月
2. 厂家"10 年保修"结果是**返厂保修**不是上门保修——安装商吃人工
3. 同款产品灰渠道低 12% 冲击,砸授权伙伴价盘
我方针对欧洲集成商配置:
- **CE + IEC 62619 + VDE 2510-50 + BSW 准入** 户储,VDE-AR-N 4105 / EN 50549 并网码已认证
- **德国仓(汉堡)**——常备 500 套,德国境内 3 天到货
- **12 年上门保修 by 欧洲 GmbH 实体**——真实德国公司,真实服务商网络(SVOLT / Fraunhofer 出身团队)
- **渠道保护**——MAP 定价执行,序列号地理锁定,未授权卖家 30 天内切断
需要数据表 + 您区域安装商参考项目清单吗?可发+约 20 分钟视频演示。
中东 / 南亚 EPC 承包商(工商业储能)
💡 中文思路
中东南亚 EPC 关心的是**项目投标能不能中、EPC 利润率、政府采购合规**。要用**LCOE(度电成本)+ 融资匹配**打动,不是 kWh 单价。
🇺🇸 英文话术
Subject: 500 kWh–5 MWh BESS for C&I projects — LCOE-optimized, Sinosure-backed
Dear {Name},
{Company} has an impressive C&I portfolio in {Saudi / UAE / Pakistan}, and I noticed you're actively bidding on the {sector, e.g. Vision 2030 industrial parks / Punjab textile hubs} projects.
A 30-second pitch on why our C&I BESS platform could tighten your bid:
- **LCOE optimized**: LFP cells with 8,000 cycle life at 80% DoD → 20-year system life without replacement. Competitor NMC systems typically need cell replacement at year 10, adding $15–25/kWh to LCOE.
- **Modular**: 100 kWh building blocks, containerized to 3.44 MWh in a 20ft ISO. Reduces civil works and shortens commissioning by 4–6 weeks vs. cabinet-style.
- **Sinosure export credit backed** up to 90% for approved buyers — this alone has closed 3 deals for our EPC partners this year (financing was the deciding factor, not price)
- **DAM/EMS included** with SCADA integration to your existing DCS
Two things I'd like to ask:
1. What size BESS are you specifying in your typical bid (kWh / MW)?
2. Are you seeing bid decisions driven more by LCOE, upfront capex, or financing package right now?
If it's useful, I can send our reference project deck (3 similar-scale projects delivered in {region}) and a rough LCOE model tailored to a project of your typical size.
Best regards,
{Your Name}
🇨🇳 中文翻译
主题:500 kWh–5 MWh 工商业储能——LCOE 优化+中信保支持
{名字} 您好,
{公司} 在 {沙特/阿联酋/巴基斯坦} 的工商业储能项目很出色,注意到您正积极投标 {行业,如 2030 愿景工业园/旁遮普纺织集群} 项目。
30 秒说明我方工商业储能平台如何增强您投标竞争力:
- **LCOE 优化**:LFP 电芯 80% DoD 8000 循环 → 20 年系统寿命无需换电芯。同类 NMC 系统通常第 10 年需换芯,LCOE 增加 $15–25/kWh
- **模块化**:100 kWh 基础块,20ft 集装箱化 3.44 MWh。较柜式减少土建,调试提前 4–6 周
- **中信保**授信最高 90%——今年已帮我们 3 家 EPC 伙伴凭融资赢标(融资是决胜因素,不是价格)
- **DAM/EMS 包含**,可与您现有 DCS SCADA 集成
两个问题:
1. 您标书里典型储能规模是多少(kWh / MW)?
2. 目前中标决胜因素更看 LCOE、初始 capex 还是融资方案?
如需要,可发我方参考项目介绍({地区} 已交付 3 个同规模项目)+ 针对您典型规模的粗略 LCOE 模型。
Amazon / Costco 便携电源零售商
💡 中文思路
便携电源零售商 = 快消打法。关心**渠道价盘、售后网络、CPSC 合规、包装商品化**。开发信要讲"帮您在亚马逊 win the Buy Box"。
🇺🇸 英文话术
Subject: Portable power station — private-label ready, US warehouse + CPSC + FCC
Hi {Name},
Quick note — noticed {Brand} is doing well in the 500–2,000 Wh portable power segment on Amazon.
A few things we do specifically for US portable power PL sellers:
- **UL 2743 + FCC + DOE + Prop 65 + UN38.3** all cert-ready under your brand
- **US warehouse (LGB + JFK)** — no more 45-day ocean waits mid-Q4
- **Full private-label**: your color, your logo, your app (whitelabel), your manual
- **Return + service center in NJ** — Amazon requires local return address; we provide it
- **MOQ 300 units** for first order, no tooling fee for standard shell colors
Two competitive edges under the hood:
- Our 2 kWh unit uses **CATL LFP cells** (most competitors use B-grade LFP or NCM) — 3,500+ cycles, safer, sells better on the review page
- **App integration** with Alexa + Google Home works out of the box — the top 3 sellers on Amazon all have this, most Chinese white-label doesn't
Would a spec + wholesale sheet be useful? If you send me your target retail + volume, I can back-solve what's achievable on cost.
Best,
{Your Name}
🇨🇳 中文翻译
主题:便携电源——私标就绪,美国仓 + CPSC + FCC
{名字} 您好,
简短说下——注意到 {品牌} 在亚马逊 500–2000 Wh 便携电源市场表现不错。
我方为美国私标便携电源卖家专门配置:
- **UL 2743 + FCC + DOE + Prop 65 + UN38.3** 全部您品牌下就绪
- **美国仓(LGB + JFK)**——不再 45 天海运赶 Q4
- **完全私标**:您的颜色/LOGO/App(白牌)/说明书
- **新泽西售后中心**——亚马逊要求美国本土退货地址,我方提供
- **首单 MOQ 300 台**,标准壳色无开模费
底层两个竞争优势:
- 2 kWh 款用 **CATL LFP 电芯**(多数竞品用二级 LFP 或 NCM)——3500+ 循环,更安全,评论页表现更好
- **Alexa + Google Home 联动**开箱即可用,亚马逊 Top 3 都有这功能,多数中国白牌没有
需要规格+批发价单吗?给我目标零售价+量,我反推成本可实现空间。
询盘首次回复(项目型 vs 备货型区分)
1 个场景
客户问 "please send me your best price for 100 kWh BESS"
💡 中文思路
**这是最容易踩坑的询盘**。100 kWh 可以是户储 20 台,也可以是工商业 1 台,也可以是集装箱 1/34。价格差 3 倍。**先分清"项目型"还是"备货型"**,用一封结构化邮件"引"客户暴露真实需求。
🇺🇸 英文话术
Hi {Name},
Thanks for the enquiry. To send you a real number rather than a placeholder, I need to figure out whether this is a specific project you're sizing or a stocking order for your channel. Very different quote.
**Path A — Specific end-project**:
1. Application: residential, C&I (commercial), utility, off-grid island, telecom backup?
2. Location (country + city)? — drives grid code and shipping
3. Load profile: peak kW, daily kWh consumption, backup hours required
4. Solar coupled? What DC or AC coupling voltage?
5. Grid-tied, hybrid, or fully off-grid?
6. Installation environment: indoor / outdoor, temperature range, altitude
7. Certifications required (VDE / UL / AS / IEC)?
8. Target commissioning date?
**Path B — Stocking order for resale**:
1. Which markets/countries?
2. Existing product range and price positioning?
3. Volume forecast (qty per quarter)?
4. Warehouse location (yours or ours)?
5. Certifications required per market?
6. Brand — your brand (private label) or ours?
Answer either path and I'll come back within 48 hours with:
- System sizing proposal (if Path A) or product recommendation (Path B)
- Firm FOB / EXW quote + shipping estimate
- Warranty & service terms
- 2–3 reference projects/customers in similar context
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
感谢询盘。为给您真实报价而非占位数字,需先分清是**特定项目询价**还是**渠道备货订单**——两者价差很大。
**路径 A——特定终端项目**:
1. 应用:户用 / 工商业 / 电站 / 离网海岛 / 电信基站备电?
2. 地点(国+城)?——决定并网码和海运
3. 负载:峰值 kW、日耗 kWh、备电小时数
4. 是否配光伏?直流/交流耦合电压?
5. 并网 / 混合 / 完全离网?
6. 安装环境:室内/室外、温度、海拔
7. 认证要求(VDE / UL / AS / IEC)?
8. 目标投运日?
**路径 B——渠道备货**:
1. 目标市场/国家?
2. 现有产品线和定价定位?
3. 量的预测(季度台数)?
4. 仓库位置(您方或我方)?
5. 各市场认证要求?
6. 品牌——您私标还是我方品牌?
回答任一路径 48 小时内回:
- 系统方案(路径 A)或产品推荐(路径 B)
- FOB / EXW 报价 + 运输估算
- 保修与服务条款
- 2–3 个同类客户参考项目
项目型询盘:技术方案与配置(Sizing)
1 个场景
客户给了负载数据,需你配光储方案
🇺🇸 英文话术
Hi {Name},
Load data received — thanks for the detail. Here's my proposed sizing (with the math shown so you can validate independently):
**Your inputs**:
- Daily load: 45 kWh
- Peak load: 12 kW (10 min max)
- Backup requirement: 12 hrs (winter cloudy day scenario)
- Location: Bavaria (~1,150 kWh/kWp/year solar yield)
- Grid: 3-phase 400V, feed-in allowed
**Recommended system**:
| Component | Spec | Qty | Rationale |
|---|---|---|---|
| PV modules | 550W mono TOPCon | 22 pcs (12.1 kWp) | Sized to cover annual load + 15% margin for EV growth |
| Hybrid inverter | 12 kW 3-phase | 1 unit | Matches peak load + surge headroom |
| BESS | 20 kWh LFP wall-mount | 1 unit | Covers evening/backup load, 2 kWh reserved for cold-cycle margin |
| EMS | Included | | Time-of-use optimization + peak shaving |
**Performance model** (typical year):
- Solar production: 13,900 kWh/year
- Self-consumption ratio: 74% (with BESS) vs 32% (without)
- Grid feed-in: 3,600 kWh/year
- Payback: 7.2 years at current EE feed-in tariff + retail rate
**Total system price**: €14,200 EXW, includes 12-yr onsite warranty + monitoring app + commissioning support
If any input is off (e.g. actual peak is 8 kW not 12), the system downsizes and price drops ~15%. Want to review the numbers on a 30-min call? Also happy to share the full performance simulation PDF.
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
负载数据已收,感谢详细数据。推荐配置(附计算逻辑供您独立验证):
**您的输入**:
- 日耗:45 kWh
- 峰值:12 kW(最长 10 分钟)
- 备电需求:12 小时(冬季阴天场景)
- 地点:巴伐利亚(约 1150 kWh/kWp/年发电量)
- 电网:3 相 400V,允许上网
**推荐系统**:
| 组件 | 规格 | 数量 | 理由 |
|---|---|---|---|
| 光伏组件 | 550W 单晶 TOPCon | 22 片(12.1 kWp) | 覆盖年负载 + 15% 电动车增长冗余 |
| 混合逆变器 | 12 kW 3 相 | 1 台 | 匹配峰值 + 浪涌余量 |
| 户储 | 20 kWh LFP 壁挂 | 1 台 | 覆盖晚间/备电,保留 2 kWh 冷循环余量 |
| EMS | 含 | | 分时优化 + 削峰填谷 |
**典型年性能模型**:
- 光伏发电:13900 kWh/年
- 自用率:含储 74% vs. 无储 32%
- 上网电量:3600 kWh/年
- 回本周期:7.2 年(按当前德东上网电价+零售电价)
**系统总价**:€14200 EXW,含 12 年上门保修+监控 App+调试支持
如输入有偏差(如实际峰值 8 kW 非 12),系统降配价格降约 15%。方便约 30 分钟视频过一遍数字吗?也可发完整性能仿真 PDF。
认证 & 合规话术
1 个场景
客户问 "do you have UL 9540 / VDE / IEC 62619"
💡 中文思路
认证是新能源"入场券",客户问认证意味着他真在评估。**不要含糊说"有的"**——直接给证书号、发证机构、有效期、可查询链接。
🇺🇸 英文话术
Hi {Name},
Compliance answer, specific rather than vague:
| Standard | Status | Certificate # | Body | Valid Until | Verify Link |
|---|---|---|---|---|---|
| **UL 9540** | ✅ Full system | US-2024-3388 | Intertek | 2027-08 | intertek.com/verify |
| **UL 9540A** | ✅ Thermal runaway pass | US-2024-3389 | Intertek | N/A (test report) | Report attached |
| **UL 1973** | ✅ Battery pack | US-2024-3390 | UL | 2027-11 | ul.com/database |
| **IEC 62619** | ✅ | IEC-2024-9922 | TÜV Rheinland | 2029-03 | tuv.com |
| **IEC 62933-5-2** | ✅ Grid application | IEC-2024-9923 | TÜV | 2029-03 | tuv.com |
| **VDE 2510-50** | ✅ | VDE-2024-556 | VDE | 2029-02 | vde.com/testreport |
| **CE (EMC + LVD)** | ✅ | Attached | | | |
| **UN38.3 + MSDS** | ✅ Latest revision | Attached | | | |
| **IEEE 1547-2018** | ✅ Grid inverter | UL-2024-778 | UL | 2027-05 | ul.com/database |
| **CEC listed (AU)** | ✅ | Listed | | | cec.org.au |
**What's missing (transparent)**:
- Australian AS/NZS 3000 wiring rules — inverter compliant, install by CEC-accredited installer required
- Japan JET certification — not applicable for our current product line
All certs + test reports can be sent as a full compliance dossier. Want me to attach the PDF pack (~28 MB) or share via WeTransfer?
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
合规回复,具体不含糊:
[同英文表格]
**透明说明缺什么**:
- 澳洲 AS/NZS 3000 布线规则——逆变器合规,需 CEC 认证安装商施工
- 日本 JET——当前产品线不适用
全部证书 + 测试报告可打包发送。用邮件附件(~28 MB)还是 WeTransfer?
报价(Quotation)呈现与 TCO
1 个场景
户储 5 kWh × 200 台报价(多组件系统)
🇺🇸 英文话术
Subject: Quote #NE-2607 | 5 kWh residential BESS × 200 units | 20-yr TCO
Hi {Name},
Full quote below with TCO comparison so you can price against your competitors on the metric that actually matters to end-customers (cost-per-kWh over life).
**Configuration**: 5 kWh LFP wall-mount + 5 kW hybrid inverter + Wi-Fi monitoring, private-label under {Brand}
| Line | Unit Price EXW | 200 units |
|---|---|---|
| 5 kWh BESS | $980 | $196,000 |
| 5 kW hybrid inverter | $520 | $104,000 |
| Wall bracket + cable kit | $45 | $9,000 |
| Private-label branding | $12 | $2,400 |
| **Sub-total EXW factory** | **$1,557/set** | **$311,400** |
| Ocean freight to Hamburg (2× 40HQ) | | +$4,800 |
| Insurance | | +$1,200 |
| **CIF Hamburg** | **$1,586.5/set** | **$317,300** |
**TCO comparison (20-year)**:
| | Ours (LFP) | Typical NCM competitor |
|---|---|---|
| Cycles @ 80% DoD | 8,000 | 4,500 |
| Years to first replacement | Never (20-yr life) | Year 10 |
| Battery replacement cost | $0 | $1,100 |
| Warranty period | 12 years onsite | 10 years return |
| Round-trip efficiency | 96% | 92% |
| **TCO cost per usable kWh (20 yr)** | **$0.048** | **$0.087** |
This is the number your installers should be putting on the quote to end-customers — LFP wins even at higher upfront.
**Terms**: 30% T/T deposit, 70% before shipment. Or LC at sight, 90 days. Sinosure available.
**Lead time**: 35 days from PO + deposit
**Warranty**: 12 years onsite via our EU GmbH
Ready to move on this — want me to draft PI and reserve production slot?
Best,
{Your Name}
🇨🇳 中文翻译
[同结构,翻译略——重点是 TCO 表格显示 LFP 全生命周期胜出]
议价谈判 & 大项目付款条款
1 个场景
MW 级项目,客户要 90 天账期
🇺🇸 英文话术
Hi {Name},
90 days payment on a $1.2M container-scale project — I understand the ask (matches your project cash cycle), and I've got a workable structure. Let me lay it out:
**Option 1 — Sinosure-backed, industry standard**:
- 15% T/T deposit at PO
- 15% T/T before shipment
- 70% T/T at 90 days after B/L date, backed by Sinosure short-term export credit insurance
- Sinosure covers 90% commercial + political risk; premium (~0.6%) built into price
- **We cover Sinosure fee**, you get real 90-day terms
**Option 2 — LC 90 days**:
- 15% T/T deposit
- 85% LC 90 days at sight, confirmed by top-tier bank
- Cleaner for both sides but 1.5–2% higher on price (bank confirmation cost)
**Option 3 — Milestone-based** (for phased delivery):
- 15% at PO
- 15% at production start
- 40% before shipment
- 30% at commissioning acceptance (typically 60 days post-arrival)
Which structure works best on your side? We've closed 3 EU projects on Option 1 in Q2, so paperwork is smooth.
Also — Sinosure approval takes ~10 working days on {Company}, so if we're targeting Q4 shipment, worth starting the credit application in parallel with contract negotiation.
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
$120 万级集装箱项目 90 天账期——理解需求(匹配您项目现金周期),有可行结构:
**方案 1——中信保支持,行业标准**:
- PO 时 15% 电汇定金
- 发货前 15% 电汇
- 提单日后 90 天付 70%,中信保短期出口信保支持
- 中信保覆盖 90% 商业+政治风险;保费(约 0.6%)已含在报价
- **中信保费我方承担**,您得到真实 90 天账期
**方案 2——90 天信用证**:
- 15% 电汇定金
- 85% 90 天信用证即期,一线银行保兑
- 双方清爽,但价格加 1.5–2%(银行保兑费)
**方案 3——里程碑付款**(分批交货用):
- PO 时 15%
- 开工 15%
- 发货前 40%
- 调试验收 30%(一般到货后 60 天)
您方哪种最适合?Q2 已按方案 1 关掉 3 个欧洲项目,流程顺畅。
另——{公司名} 中信保审核约 10 工作日,如目标 Q4 出货,建议合同谈判同步启动信用申请。
打样 / 首批发货
1 个场景
首台样机寄出(附完整测试报告)
🇺🇸 英文话术
Hi {Name},
Sample unit shipped — DHL AWB 88776655, ETA {date}. Serial number: BM5-260728-001.
**Included in the box**:
- 1× 5 kWh BESS unit (serial 001)
- 1× hybrid inverter (serial IV-001, paired)
- Wall bracket + all cables + terminations
- Wi-Fi dongle (pre-registered to your account, credentials sent separately)
- **Complete test report** — see below
**Pre-shipment test results** (each unit tested, not batch):
| Test | Result | Standard |
|---|---|---|
| Capacity | 5.08 kWh @ 0.5C, 25°C | ≥ 5.00 kWh |
| DC internal resistance | 42.3 mΩ | ≤ 50 mΩ |
| Charge/discharge efficiency | 96.4% round-trip | ≥ 95% |
| Cell voltage delta | 8 mV max | ≤ 30 mV |
| BMS protection: OV, UV, OT, SC | All triggered per spec | Per IEC 62619 |
| Hi-pot 2500 V | Pass | UL 1973 |
| Insulation resistance | 200 MΩ | ≥ 100 MΩ |
| Communication (CAN + Wi-Fi + Modbus TCP) | All pass | |
**What to test on your side**:
1. Full charge + discharge cycle end-to-end
2. Grid-tie with your local grid — check power quality (THD, PF)
3. Backup mode transition time (should be <20 ms UPS-grade)
4. Wi-Fi app functions on your local network
5. Load rejection / recovery per your grid code
Suggest we book a 30-min video call 5–7 days after arrival — I can walk your engineer through anything unexpected. Bulk production stays on hold until your sign-off.
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
样机已发,DHL 88776655,预计 {日期} 到,序列号 BM5-260728-001。
**包裹内容**:
- 1× 5 kWh 户储(序列 001)
- 1× 混合逆变器(序列 IV-001,配对)
- 壁挂支架 + 全套线缆 + 端子
- Wi-Fi 模块(已注册您账号,凭证另发)
- **完整测试报告**——见下
**出厂前测试**(逐台测非抽测):
[表格同英文]
**您需测的**:
1. 完整充放电循环端到端
2. 与您当地电网并网 — 检测电能质量(THD, PF)
3. 备电切换时间(应 <20ms UPS 级)
4. Wi-Fi App 在您本地网络的功能
5. 按您并网码做负荷投切/恢复测试
建议到货后 5–7 天约 30 分钟视频,我陪您工程师过一遍异常。批量生产暂停等您签样。
生产 & 出货跟进
1 个场景
主动周报 + 船期紧张场景
🇺🇸 英文话术
Subject: [W29 update] PO NE-2607 | Production 68% | Shipping alert
Hi {Name},
Weekly status:
| Stage | Status | Progress |
|---|---|---|
| LFP cell (CATL) delivery | ✅ Done 7/18 | 200/200 |
| Cell sorting + grouping | ✅ Done 7/22 | 200/200 |
| Module assembly | ✅ Done 7/25 | 200/200 |
| Cabinet + BMS integration | 🟡 In progress | 135/200 |
| Aging test (72 hrs) | ⏳ Scheduled 7/29 | |
| Final QC + report | ⏳ Scheduled 8/1 | |
| Packing + palletizing | ⏳ Scheduled 8/3 | |
| FOB Shenzhen | 🎯 Target 8/5 | |
**Shipping heads-up (please read)**:
Peak season ex-China is starting. The 8/5 sailing I originally booked (MSC, ETA Hamburg 9/9) got rolled — carrier oversold. Two options:
- **Option A**: Take the next MSC sailing 8/9 (ETA Hamburg 9/13). Same rate. Adds 4 days to your delivery.
- **Option B**: Switch to Maersk 8/6 sailing (ETA Hamburg 9/8). Rate +$380 per 40HQ (my cost, we split 50/50). Original schedule preserved.
Which one? I need to confirm within 24 hours to lock either slot. My default if I don't hear back is Option A (no extra cost to you).
Also confirming your BL consignee is still {consignee name} and notify party {notify party}?
Best,
{Your Name}
🇨🇳 中文翻译
主题:[W29 更新] PO NE-2607 | 生产 68% | 船期预警
{名字} 您好,
本周进度:
[表格同英文]
**船期预警(请阅)**:
出口旺季启动。原订 8/5 MSC 船(汉堡 ETA 9/9)被 rolled——船公司超卖。两选项:
- **A**:下一班 MSC 8/9(ETA 9/13),同价,交货延后 4 天
- **B**:改 Maersk 8/6(ETA 9/8),40HQ 加价 $380(我方成本,五五分),原时间不变
请 24 小时内确认锁舱。如未回复默认 A(您无额外成本)。
另确认您 BL 收货人仍是 {收货人},通知方 {通知方}?
品质与售后
1 个场景
现场故障,客户投诉 3 台户储无法启动
🇺🇸 英文话术
Hi {Name},
Sorry to hear — 3 units failing to boot is not acceptable and I take it seriously. Let's diagnose fast so we can restore your installer's schedule.
**Right now (60 min)**:
Please have your installer send me:
1. Serial numbers of the 3 units
2. Photos of the units on the wall + inverter display screen
3. Any error code showing on the app or LED indicator pattern
4. Video of power-on attempt (see LED sequence + hear any relay click)
With serial numbers I can pull:
- Factory QC data for each unit (voltage / IR / capacity from aging test)
- Firmware version + last cloud connection log
- Whether these came from the same production batch
**Common causes for boot failure** (based on 3-unit pattern I've seen before):
- **Shipping damage — BMS cable disconnect (60% likelihood)**: fix is opening the unit, reseating one connector, 15 min job. I'll walk your installer via WhatsApp video.
- **Firmware version mismatch with inverter (25%)**: OTA update from our cloud, no visit needed.
- **Actual defective unit (15%)**: need RMA replacement — from our EU warehouse, 3 days.
**What I commit right now** regardless of cause:
- **Free onsite service call from our EU service partner** if remote fix doesn't work — dispatched within 24 hrs
- **Replacement units on standby** from Hamburg warehouse in case RMA needed — no waiting for factory
- **Installer labor credit**: $150 per unit for any onsite time, paid to your installer directly (this is the pain point most manufacturers ignore)
Please get the info back to me and I'll have a diagnosis within 2 hours. If needed, I can hop on Zoom with your installer live.
Best,
{Your Name} | Service line +49 XXX XXX XXXX (24/7 EU)
🇨🇳 中文翻译
{名字} 您好,
抱歉——3 台无法启动不可接受,我认真对待。快速诊断恢复您安装商日程。
**立即(60 分钟内)**:
请您安装商发我:
1. 3 台序列号
2. 上墙照片 + 逆变器显示屏
3. App 上任何错误码或 LED 指示模式
4. 开机尝试视频(看 LED 顺序、听继电器咔嗒声)
有序列号我可调:
- 每台出厂 QC 数据(老化测试电压/内阻/容量)
- 固件版本 + 最后云端连接日志
- 是否同批
**启动失败常见原因**(我见过的 3 台模式):
- **运输损伤——BMS 排线松脱(60% 概率)**:解决是打开机器重插一个接头,15 分钟。我 WhatsApp 视频陪您安装商操作
- **固件与逆变器不匹配(25%)**:云端 OTA 升级,无需上门
- **实际不良(15%)**:RMA 替换,欧洲仓 3 天到
**不论原因我方承诺**:
- **免费欧洲服务商上门**(远程解决不了时),24 小时内派工
- **替换机备用**(汉堡仓),如需 RMA 不等工厂
- **安装商工时补贴**:$150/台上门时间,直付安装商(这是多数厂家忽视的痛点)
信息发我 2 小时内出诊断。如需可 Zoom 现场连线您安装商。
复购 / 框架协议 / 独家代理
1 个场景
客户合作 6 个月,主动提独家代理
🇺🇸 英文话术
Hi {Name},
Reviewing our numbers together — 6 months in, 4 POs totalling ~$780K, zero warranty claims, on-time delivery 100%. You're clearly the strongest partner for us in {country}. Time to talk about locking this in on a bigger structure.
**Proposal: {Country} exclusive distributorship for 2027**, structured as follows:
**Exclusivity we give you**:
- Sole importer of our {product line} in {country}
- No direct sales from us to any {country} end-customer (excluding existing accounts, listed)
- MAP pricing enforced across all your sub-dealers
- First look at any new product (30 days head start vs. other markets)
- Your logo listed as "Authorized Distributor" on our global website
**Volume commitment from you**:
- $2.4M in 2027 (roughly 3× your 2026 pace)
- Split as: 25% Q1, 25% Q2, 25% Q3, 25% Q4 (rolling PO calendar, adjustable ±20%)
**What we invest for you**:
- $30K marketing co-op fund (matched 1:1 by your spend, up to $60K total)
- 2 sales training visits to your team per year (our cost)
- One "flagship project" showcased jointly per quarter
- Free demo units for your top 5 installers (up to 10 units total)
**Exit clauses (fair)**:
- Either party can terminate with 6-month notice
- Termination for cause (breach, insolvency) — 30 days
- If you undershoot 30% of committed volume, exclusivity converts to preferred (non-exclusive) — no penalty
Want to hop on a call this week to walk through the term sheet? I can send a draft MOU ahead so you have something concrete to react to.
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
回顾数据——6 个月合作 4 单共约 $78 万,0 保修申诉,交期准时 100%。您显然是我方在 {国家} 最强伙伴,是时候用更大结构锁定关系。
**提议:{国家} 2027 年独家代理**,结构如下:
**我方给您的独家性**:
- {产品线} 在 {国家} 独家进口权
- 我方不向 {国家} 任何终端客户直销(除现有客户,已列出)
- MAP 定价对您所有下游经销商执行
- 新品首发(比其他市场提前 30 天)
- 我方全球官网列您为"授权代理"
**您的销量承诺**:
- 2027 年 $240 万(约 2026 节奏的 3 倍)
- 分季度 25%/25%/25%/25%,PO 日历滚动 ±20% 可调
**我方为您投入**:
- $3 万联合营销基金(您 1:1 匹配,最高共 $6 万)
- 每年 2 次销售培训到您团队(我方费用)
- 每季联合展示 1 个"旗舰项目"
- 您 Top 5 安装商免费演示机(最多 10 台)
**退出条款(公平)**:
- 任一方 6 个月提前通知可终止
- 违约方(违反、破产)30 天
- 未达承诺量 30% 独家转优先(非独家),无罚款
本周约视频过一遍条款吗?我可先发 MOU 草稿供反应。
展会 / 视频会议
1 个场景
Intersolar / RE+ 展台 30 秒电梯自我介绍
🇺🇸 英文话术
Hi, I'm {Name} from {Company}. Most Chinese BESS makers pitch you the same three things — kWh price, cycle count, and factory size. I'll skip those. What actually saves your installers money is the *last-mile* — do you have local warehouse so they don't wait 45 days for a replacement? Do you have onsite service so they don't lose a truck-day chasing a firmware bug? We're built specifically for that: Hamburg warehouse always stocked, German GmbH for onsite service, 12-year warranty that's actually onsite. Are you running into any of those pain points now with your current supplier?
🇨🇳 中文翻译
您好,我是 {公司} 的 {名字}。多数中国储能厂给您推的都是同三样——kWh 价格、循环次数、工厂规模,这些我跳过。真正帮您安装商省钱的是**最后一公里**——有本地仓吗,不让他们等 45 天换机?有上门服务吗,不让他们跑一趟工地修固件?我们就是为这个搭建的:汉堡仓常备、德国 GmbH 上门服务、真正上门的 12 年保修。您现在的供应商有踩这些坑吗?
沉默客户激活
1 个场景
60 天无回复(结合行业新闻)
🇺🇸 英文话术
Hi {Name},
Not chasing a PO — thought this might be useful given what's happening in the market:
Two industry heads-up your buyer-side team might not have caught yet:
1. **LFP cell contract prices bottomed in July**. CATL / EVE quarter-4 quotes are moving up ~4%. If you've got any 2026 project deposits pending, worth having us lock cell pricing on your next PO now.
2. **US Section 232 review on batteries** — decision expected Q1'27. If you're serving US customers, might be worth a Mexico transshipment discussion; we have a partner in Monterrey doing final assembly for a few of our US clients.
No ask. If either topic is relevant, I'm here to walk through it.
Best,
{Your Name}
🇨🇳 中文翻译
{名字} 您好,
不催单——鉴于市场动态,觉得这些对您有用:
两条您采购团队可能没抓到的行业信息:
1. **LFP 电芯合约价 7 月见底**。CATL / EVE Q4 报价上行约 4%。如您有 2026 项目定金在途,值得下 PO 时先锁我方电芯价
2. **美国 232 条款电池审查**——预计 Q1'27 决定。如您服务美国客户,值得聊墨西哥转口方案;我们蒙特雷有伙伴为几家美客户做终装
无请求。任一话题相关我在这陪您过。
常见问题
客户上来就要各种认证证书怎么应对?
先确认对方目标市场和应用场景,不同国家和并网要求对应的认证清单完全不同。给清单的同时说明每项证书的适用范围和有效期,比直接甩一堆 PDF 更专业。本页合规板块有应答模板。
新能源项目报价周期长,怎么保持跟进不打扰?
按项目节点跟进而不是按时间跟进。在客户的招标、设计、选型各阶段提供对应价值信息。本页跟进板块提供了分节点的邮件序列。
客户要求长账期怎么谈?
把账期和订单规模、付款担保方式绑定谈判,提供多组组合方案让客户选择,而不是在单一维度上让步。
其他行业话术
需要针对你的产品定制话术?欢迎交流